Definitions: APQP ASDE BOM EPR ESWP Advanced Product Quality Planning Advanced Supplier Development Engineer Bill of Material Early Program Review Early Sourcing Work Plan. A report including Commodity Classification (Metals,... Definitions: APQP ASDE BOM EPR ESWP Advanced Product Quality Planning Advanced Supplier Development Engineer Bill of Material Early Program Review Early Sourcing Work Plan. A report including Commodity Classification (Metals, Non- Metals, Electrical/electronics), source-required dates, cost targets, and production tooling kick-off required dates for all purchased components. The document representing the European ESWP is On Track, the NA is PPTM. Procedure # VP-014 LRR On Track PPAP PPTM PSW RPC SDE SOP SPE VPDS vTPS Procedure: Launch Readiness Review European version of the Early Sourcing Work Plan (ESWP) Production Part Approval Process Purchased Parts Tracking Matrix (ESWP/PPTM): The North American version of the ESWP. The ESWP/PPTM is an Access Database maintained by NA Program Purchasing (vTPS) to capture all Forward Model Purchase Component information. Part Submission Warrant Regional Program Coordinator is a function within SPE in Europe and South America. Supplier Development Engineer Start Of Production (sometimes referred to as Job 1) Supplier Performance Engineer (combined ASD and SD Engineer) Visteon Product Development System , PD/Program Management Gateway process used to manage the successful launch of new model programs. The North American data storage system which holds all PPTM/ESWP data. vTPS is an Access Database Responsibility: Process Map/Flowchart (1) Lead: RPC/SPE (EU & SA) (1) Lead – ASDE (NA & Asia) Conduct High Impact Assessment assign ASD / SP engineer on formal W/support from: Program sourcing and / or change of BOM. Buyer PD Engineer Program Manager – All Regions (2) Notes/Deliverables (1) Inputs:  ESWP or local equivalent from VP-040 Project Supply Management Outputs:  High Impact Assessment Form (VF-014a or local equivalent) Notes:  Conduct High Impact Assessment and record results per local work instructions (2) Lead: RPC/SPE (EU & SA) Lead – ASDE (NA & Asia) W/support from: Program Buyer - All Regions, Buyer - All Regions (3) Lead: Program Buyer (NA & EU & Asia) Lead: RPC/SPE (SA) (4) No No (2) Is the part High Impact? (3) Can Supplier achieve PSW Timing? Yes Go to Step # 5. Yes Go to Step # 8. (3) Notes:  Record PPAP status on local tracking system. (4) Hard Copies of This Document are Uncontrolled Page 2 of 4 (4) Acceptable risk to Yes
评论
全部评论
古古怪怪个个3
定义:

APQP
ASDE
BOM
EPR
ESWP
Advanced产品质量计划
Advanced供应商开发工程师 材料Bill
Early计划回顾
Early源头工作计划。 一个报告包括商品种类(金属,非
Metals,电或电子),来源必需日期,花费目标和生产凿出的装饰
kick-off为所有被购买的组分需要日期。 代表的本文European ESWP在轨道, NA是PPTM。
Procedure # VP-014

LRR
On轨道
PPAP
PPTM

PSW
RPC
SDE
SOP
SPE

VPDS

vTPS

Procedure :

Launch准备回顾 早源头工作计划(ESWP)的European版本
Production零件审批流程 跟踪矩阵(ESWP/PPTM)的Purchased零件: 的北美洲版本ESWP. ESWP/PPTM是NA节目维护的通入数据库购买获取所有向前式样购买组分信息的 (vTPS)。
Part提议保证
Regional节目协调员是在SPE之内的一个作用在欧洲和南美洲。
Supplier开发工程师 生产Start (有时指工作1)
Supplier表现工程师(联合的ASD和SD工程师)

Visteon产品开发系统, PD/Program管理门户过程使用的
to处理新的模型节目成功的发射。 举行所有PPTM/ESWP数据的The北美洲数据存储系统。 vTPS是
Access数据库
Responsibility : 处理地图或流程图
(1)
Lead : RPC/SPE (欧盟& SA) (1)
Lead – ASDE (NA &亚洲)品行高冲击评估
assign ASD/正式的SP工程师
W/support从: 节目BOM的源头和变动。
Buyer
PD工程师
Program经理–
All地区

(2)
Notes/Deliverables
(1)
Inputs :
 ESWP或本机等效从
VP-040项目供应
Management

Outputs :
高冲击评估形式
(VF-014a或地方等值)

Notes : 高冲击的品行
Assessment和记录结果
per地方工作规程

(2)

Lead : RPC/SPE (欧盟& SA)
Lead – ASDE (NA &亚洲)

W/support从: 节目
Buyer -所有地区,买家-
All地区

(3)
Lead : 节目买家(NA &
EU &亚洲)
Lead : RPC/SPE (SA)

(4)

No

No
(2)
Is零件 高冲击的 ?

(3)
Can供应商
achieve PSW
Timing ?
Yes

对步的Go
# 5。

Yes

对步的Go
# 8。

(3)
Notes : 在本机的记录PPAP状态
tracking系统。

(4)
本文的Hard拷贝是未管制的第2页4
(4)
Acceptable
risk
Yes